Hello,
since i have version 0.4.9 i have problems scheduling my downloads, with 0.4.8 everything works great but when i schedule in 0.4.9 i get the following problem:
Current Schedules:
Task 1: 7:00 - Daily - speedlimit 500
Task 2: 22:00 - Daily - resume
after 22:00 hour the download speed is still 500Kb/s, i want the schedule to full download speed between 22:00 hour and 7:00 hour but i can't seem to find how i schedule this.
hope someone can help me.
ps i use sabnzb with my qnap TS219 nas.
scheduling problems with SABnzbd+ 0.4.9.
Forum rules
Help us help you:
Help us help you:
- Are you using the latest stable version of SABnzbd? Downloads page.
- Tell us what system you run SABnzbd on.
- Adhere to the forum rules.
- Do you experience problems during downloading?
Check your connection in Status and Interface settings window.
Use Test Server in Config > Servers.
We will probably ask you to do a test using only basic settings. - Do you experience problems during repair or unpacking?
Enable +Debug logging in the Status and Interface settings window and share the relevant parts of the log here using [ code ] sections.
-
- Newbie
- Posts: 2
- Joined: May 10th, 2009, 11:41 am
Re: scheduling problems with SABnzbd+ 0.4.9.
set the speedlimit to 0 at 22:00
-
- Newbie
- Posts: 2
- Joined: May 10th, 2009, 11:41 am
Re: scheduling problems with SABnzbd+ 0.4.9.
Thanks,
going to try that tonight.
going to try that tonight.